overhead crane introduction

Overhead Cranes also named Bridge Cranes or Electrical Overhead Traveling (EOT) Cranes is kind of industrial lifting equipment, which is widely used in various industrial applications for material handling to improve working efficiency and safety. According to the material handling purpose and structure, the overhead crane can mainly be classified into the following type, Low Headroom Single Girder Overhead Crane QDY Ladle Overhead Crane, Single Girder Suspension overhead Crane, Double Girder electric hoist Crane, Explosion Proof Bridge Crane, Explosion-proof Single Girder Overhead Crane, Electromagnetic Overhead Crane, Single Girder Electric Hoist Crane up, Overhead Crane With Hook, Grab Bucket Overhead Crane, Insulation Overhead Crane and Double Trolley Overhead Crane, etc.

Among the various overhead cranes, how to choose the optimal one for your applications? It depends on your factory conditions and material handling requirements. What if your working area is limited, you need relatively larger working space for material handling? How to solve the trouble? Now let’s see how Dongqi Hoist and Cranesolves the problem and see the Paraguay EPS sandwich panel factory crane project case study.

Customer’s company profile

The Paraguay client is a manufacturer of thermal sandwich panels. They have several thermal sandwich panel production lines, which has certain influence in their local market.

dqcranes\' clinet
Thermal sandwich panels from the Paraguay client Of DQCRANES

Lifting requirements

During the sandwich panel production, they need to move coils of steel sheet for stocking and for placing them in a continuous production line for EPS sandwich panel. Here comes the question: The factory has been built up within the wall with the height around 1.2 m which limits the working area of material handling. In order make the most of the working space, the client requires that the bucket should be set up closely against the wall. How to realize these requirements? See our solution diagram below:

crane bucket foundation drawing
Crane bucket foundation drawing

Material handling solution

Based on the working conditions and lifting requirements, Dongqi Hoist and Crane recommended the Paraguay client the 10 ton single girder overhead crane, with a special designed bucket, at the corners the foundations of which are narrowed down to 1/4 of the normal size and special materials and additional bolts are used to ensure the stability and safety (Seen the designing drawing above).

crane bucket and bolts for single girder overhead crane

The bucket and bolts for the single girder overhead crane

The single girder overhead crane can help the client to lift and move the coil of steel plates and the specially designed foundation can largely save space for the crane. At same time, the safety and stability of the overhead crane is guaranteed. The lifting requirements of the client are perfectly satisfied.

 

overhead crane with single girder drawing

Single girder overhead crane drawing
10 ton single girder overhead crane with steel structure workshop

10 ton single girder overhead crane with steel structure workshop
After the confirming of the crane drawing, everything went well with the crane production, packaging and delivery and installation.

Packing picture of single girder overhead crane

overhead crane packing picture

Overhead crane shipment picture

Dongqi Hoist and Crane suggest customer choose the open top container due to irregular shape, since it’s easy for loading and unloading, and it is safe as well.

overhead crane delivery

Delivery of the overhead crane

 

Customer’s installation site:

DQCRANES provide detailed installation instruction, including mechanism and electric, it’s easy for customer if they choose to install it by themselves. We can also provide installation guide by phone or email or other communication tools if customer request.

overhead crane installation site at Paraguay
Overhead crane installed at the Paraguay factory

Conclusion

As for the crane project, the features of the material handling solutions are:
1)10 ton single girder overhead crane can fully meet the material handling requirement of the coils of steel plates which is cost effective.
2) The special designed crane bucket and foundation can largely save the working space which on the other hand improves the cost-effectiveness of the single girder overhead crane.
3) The safety and stability of the crane is guaranteed with low cost.

Dongqi Hoist and Crane is always dedicated to provide optimal material handling solution for clients around world. No matter what kind of conditions you have and what kind of problem confronted, Dongqi Hoist and Crane will find the most ideal one for you. Dongqi Hoist and Crane is here to lift you up!